top of page

Our
Projects

From concept to completion, our projects reflect our commitment to engineering excellence, safety, and sustainability. We specialize in delivering high-impact solutions across mining, infrastructure, and geotechnical sectors throughout Africa. 

 

Explore our recent works and see how we turn challenges into measurable outcomes.

Yanfolila Gold Mine - Plant Expansion Project

We conducted comprehensive geotechnical and material testing to support informed design and quality assurance, including:

​

  • Foundation testing using DCPT and in-situ density methods to assess ground bearing capacity.

  • Concrete testing through slump and shear strength evaluations to ensure structural integrity.

  • Laboratory testing of soil samples, covering CBR, moisture content, and density relationships for accurate subgrade characterization.

 

These tests played a crucial role in guiding construction decisions and ensuring long-term performance of the infrastructure.

Picture6.jpg

Keniendife Road Construction Project

We provided end-to-end quality control services for a major road construction project, ensuring compliance with engineering standards and long-term durability.

​

Our scope included:

  • Concrete mix design and testing, optimizing workability and strength based on site requirements.

  • Foundation testing to evaluate subgrade strength and compaction using in-situ methods.

  • Comprehensive materials testing on aggregates, soils, and binders to validate their suitability for road layers.

  • Operation of an on-site laboratory, enabling real-time analysis, faster reporting, and improved construction response time.

 

This integrated QA/QC approach ensured high construction quality, minimized rework, and supported timely project delivery.

Picture1_edited.png

Yanfolila Gold Mine -TSF Stage 4 Construction

Since 2019, AES has played a vital role in the development of this multi-staged Tailings Storage Facility (TSF) in collaboration with Hillerton Consulting Ltd. Our contributions to Stage 4 of the TSF have focused on ensuring construction integrity, design compliance, and performance monitoring.

​

Our services included:

  • Construction QA/QC for embankment and associated works

  • On-site laboratory management for soil, aggregate, and concrete testing

  • Design review and adaptation to field conditions

  • Topographic and control surveys for layout accuracy and volume tracking

  • Installation of Vibrating Wire Piezometers (VWPs) for real-time pore pressure monitoring

  • Survey monument installation to support long-term dam monitoring and deformation tracking

 

Our involvement continues to contribute to safe tailings management, compliance with international standards, and informed decision-making through accurate data and quality control.

20210212_083014.jpg

Yanfolila Gold Mine -TSF Stage 5 Construction

AES personnel have been actively involved in the development and monitoring of this multi-staged Tailings Storage Facility (TSF) since 2019, working in close collaboration with our partner, Hillerton Consulting Ltd.

​

For Stage 5, our team provided integrated field and technical support including:

  • Construction QA/QC to ensure embankment integrity and adherence to specifications

  • On-site laboratory management for consistent and reliable material testing

  • Design review to align construction with geotechnical and operational realities

  • Survey services for layout verification and progress tracking

  • Installation of Vibrating Wire Piezometers (VWPs) for monitoring pore water pressure

  • Installation of survey monuments to facilitate long-term deformation monitoring

 

Our continued involvement demonstrates our commitment to safe, data-driven TSF development aligned with international best practices.

20210210_153054.jpg

LEFA TSF 2 STAGE 1 CONSTRUCTION

AES supported the successful execution of Stage 1 of LEFA TSF by delivering critical project management and materials testing services.

​

Our responsibilities included:

  • Project management, coordinating construction activities, schedules, and stakeholder engagement to ensure timely and cost-effective delivery.

  • Laboratory testing of soils, aggregates, and concrete to confirm compliance with design specifications and performance standards.

 

Our involvement at this foundational stage helped establish strong quality control systems and efficient project workflows, laying the groundwork for safe, staged TSF expansion.

Picture5.png

CONTACT

Ghana Office

Afrique Engineering Services

Plot 10 Amanfo Street

Kumasi - Ghana

QUICK LINKS

Mali Office

African Engineering Services

Kalaban Coura ACI, Rue 277, Porte 1481

Bamako - Mali

Email

admin@africanengineeringservices.com

Phone

+233 549 232 568

Connect

  • Facebook
  • X
  • LinkedIn

         © 2025 by African Engineering Services. All Rights Reserved.

bottom of page